Project Overview:
TNS were engaged to deliver a turnkey electrical package at Norwich Crown Point Depot to support Greater Anglia’s sustainability and modernisation programme. The project combined external lighting and EV charging infrastructure to enhance depot operations and future-proof facilities.
Scope of Works:
- Supply and installation of approximately 8 no. lighting columns to improve depot illumination and safety
- Installation of 8 no. EV charging units with associated electrical infrastructure
- Installation of feeder pillar, data cabinet, and 5G router to support connectivity and monitoring of chargers
- LV SWA cabling and data cabling installed to serve both lighting and EV charging systems
- Full electrical coordination and design, including cable calculations, load assessments, and integration with existing systems
Project Highlights:
- Works carried out in a live operational depot environment, with careful planning to avoid disruption to train operations and maintenance activities
- Combined delivery of power and data systems to provide a fully integrated charging and lighting solution
- Bespoke containment and cable routing solutions designed to meet depot operational requirements
Benefits to the Client:
The installation provided Greater Anglia with enhanced depot lighting for safety and security, as well as modern EV charging facilities to support the transition to greener fleet and staff vehicles. The coordinated design and build approach ensured a seamless installation, maximising efficiency and minimising disruption.
